by plsedv | Aug 30, 2019 | Air
First Brazilian Production Aircraft – to be Used as Test Platform The first Brazilian GRIPEN E combat aircraft – 39-6001 – conducted its maiden flight from Saab’s airfield at Linköping, Sweden, on 26 August. The 65-minute flight covered test points to verify basic...
by plsedv | Aug 30, 2019 | C4ISR
Lightweight, Rugged sensor for Mission-Critical Applications Canadian developer of night vision, thermal imaging and fusion thermal devices, GSCI Advanced Photonics, has released the latest in a long line of developments using the company’s patented fusion technology...
by plsedv | Aug 30, 2019 | Naval
Informative Illustrations of Impact on Performance, Safety and Mission Success The alignment of main propulsion shafts in naval vessels – while seeming to many, perhaps, to be a minor issue – is, in reality, something that can have significant impact on a vessel’s...
by plsedv | Aug 30, 2019 | Air
Experience-Based Offer Suggests A$3 Billion in Savings Airbus Helicopters is proposing a cost-effective approach to Australia’s LAND 4503 Armed Reconnaissance Capability that could generate A$3 billion (€1.8 billion) in savings to the Australian Army and taxpayers...
by plsedv | Aug 30, 2019 | Naval
OASIS Will Manage Signatures and Reduce Risk QinetiQ has won a contract valued at £18.7 million (€20.6 million) to help protect Royal Navy (RN) surface vessels and submarines, the company announced on 9 August. The Operational Assessment of Signatures Informing...