+49 2641 3703 – 0 +49 2641 3703 – 199 info@moench-group.com

Mexican POLA

Mexican Navy & Damen cooperate in technologically advanced ship

 

Damen Shipyards Group and the Mexican Navy, via the Directorate General of Shipbuilding, are currently working together to build the Long Range Ocean Patrol (POLA), “the most technologically advanced vessel in Latin America,” according to the company.

With this, the Mexican Navy will join the list of navies around the world that have Damen Schelde Naval Shipbuilding vessels in their fleets. 

This vessel will be capable of carrying out various missions such as safeguarding Mexican sovereignty, international security cooperation, long range search and rescue operations and humanitarian aid,” a Damen representative said. “POLA will allow the Mexican state to increase its surveillance coverage and the protection of Mexican maritime interests beyond the Exclusive Economic Zone.”

Damen is transferring knowledge to the Mexican shipbuilding industry through this project, a process that Damen undertakes regularly via the Damen Technical Cooperation (DTC). This project, however, takes the DTC concept to the next level, the company says: Damen and the Mexican Navy took the decision to build two of the six modular sections of the vessel at Damen Schelde Naval Shipbuilding (DSNS) in Vlissingen, the Netherlands. The remaining four modules will be built locally in Mexico. The construction of these modules, along with the integration, will be carried out at a yard that cooperates on this with Damen. “In this way, for the most part the vessel will be built for Mexico, in Mexico, by Mexicans,” the Damen representative continued.

During the construction of the modules in Europe, a Mexican team is based in the Netherlands to supervise the process and to receive knowledge transfer. At the same time, Damen is benefitting from the transfer of region-specific expertise from the Mexican delegation.

The first of the Dutch modules has already arrived in Mexico, where it is being integrated by Mexican personal with two of those already built in Salina Cruz. Just 15 months following the inking of the contract, the hull is already complete in drydock. It will now be prepared to receive the other three superstructure modules.

The flagging ceremony of the POLA is planned for November 2018. After this, a full integrated process of setting to work, commissioning, training, tests and trials will continue in 2019.

 

Related Posts

Publish date

06/27/2018

Sign up to our newsletter and stay up to date.

News

Air

C4ISR

Components / Systems

Cyber

Defence Business

Homeland Security

International Security

Land

Latin America (Spanish)

Logistics

Naval

Training & Simulation

Space

Special Forces

Unmanned

Publications

Contact Us

Contact Info

Mönch Verlagsgesellschaft mbH
Christine-Demmer-Straße 7
53474 Bad Neuenahr – Ahrweiler

+49 2641 3703 – 0

+49 2641 3703 - 199

Follow On

X